The Traceability Gap: Managing Risk Across Suppliers Beyond Tier 1
click here to discover importer exporter profiles & logistic partners
Shipments
Trading Partners
Markets
Products/HS Code
Imports Data of
ooo new time building
yunus obod district, tashkent, a. temur ave., 95a, uzbekistan
ooo new time building is based out of uzbekistan with 451 import shipments recorded in global import export data.
Trade Trends of ooo new time building
from Jan 2022 to Sept 2025Shipments Imported: 451
As Buyer Trade Value (USD): $9.96 M
Shipments Exported: 0
As Supplier Trade Value (USD): $0
Import and Export shipments of "ooo new time building"
As Buyer
| Consignee Name | Shipper Name | HS Code | Shipment Weight (kg) | Product Keywords | Shipment Date |
|---|---|---|---|---|---|
| 730300 | 4751 | 1. CAST IRON HOLLOW PIPES, INTENDED FOR INSTALLATION IN SEWERS AT SITES WITH INCREASED REQUIREMENTS TO NOISE PROTECTION: CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) Model: SML DN 100, quantity 174 pcs. CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) | Sep 17, 2024 | ||
ooo new time building | ooo tekhindustriya | 730300 | 4751 | 1. CAST IRON HOLLOW PIPES, INTENDED FOR INSTALLATION IN SEWERS AT SITES WITH INCREASED REQUIREMENTS TO NOISE PROTECTION: CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) Model: SML DN 100, quantity 174 pcs. CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) | Sep 17, 2024 |
ooo new time building | ooo tekhindustriya | 730300 | 4751 | 1. CAST IRON HOLLOW PIPES, INTENDED FOR INSTALLATION IN SEWERS AT SITES WITH INCREASED REQUIREMENTS TO NOISE PROTECTION: CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) Model: SML DN 100, quantity 174 pcs. CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) | Sep 17, 2024 |
ooo new time building | ooo tekhindustriya | 730300 | 4751 | 1. CAST IRON HOLLOW PIPES, INTENDED FOR INSTALLATION IN SEWERS AT SITES WITH INCREASED REQUIREMENTS TO NOISE PROTECTION: CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) Model: SML DN 100, quantity 174 pcs. CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) | Sep 17, 2024 |
ooo new time building | ooo tekhindustriya | 730300 | 4751 | 1. CAST IRON HOLLOW PIPES, INTENDED FOR INSTALLATION IN SEWERS AT SITES WITH INCREASED REQUIREMENTS TO NOISE PROTECTION: CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) Model: SML DN 100, quantity 174 pcs. CAST IRON SOCKETLESS PIPE (LENGTH 3 M.) | Sep 17, 2024 |
Trademo turns 3B+ shipment records and 15M+ company profiles into actionable data for trade prospecting. Subscribe to Trademo Intel to grow the pipeline.
Solutions Built for Every Stage of Global Trade
Trading Partners of ooo new time building
Top Companies "ooo new time building" is importing from (by Value USD)
| Supplier | 2024 | 2023 | 2022 |
|---|---|---|---|
gucsan makina dogalgaz madencilik gida sanayi ve ticaret ltd sti | 1.83 M | - | - |
llc profmetall | 38.47 K | 1.18 M | 479.48 K |
| - | 612.07 K | 595.39 K | |
| - | - | 730.33 K | |
| - | 726.8 K | - |
Markets in which ooo new time building trades
Products/HS Codes traded by ooo new time building
Top HS Codes Imported by "ooo new time building"
USD 2.81 M | 31.26%
Aluminium and articles thereof Aluminium structures (excluding prefabricated buildings of heading 94.06) and parts of structures (for example, bridges and bridge-sections, towers, lattice masts, roofs, roofing frameworks, doors and windows and their frames and thresholds for doors, balustrades, pillars and columns); aluminium plates, rods, profiles, tubes and the like, prepared for use in structures. - Other
Aluminium and articles thereof Aluminium structures (excluding prefabricated buildings of heading 94.06) and parts of structures (for example, bridges and bridge-sections, towers, lattice masts, roofs, roofing frameworks, doors and windows and their frames and thresholds for doors, balustrades, pillars and columns); aluminium plates, rods, profiles, tubes and the like, prepared for use in structures. - Other
USD 1.05 M | 26.16%
Articles of iron or steel Structures (excluding prefabricated buildings of heading 94.06) and parts of structures (for example, bridges and bridge-sections, lock-gates, towers, lattice masts, roofs, roofing frame-works, doors and windows and their frames and thresholds for doors, shutters, balustrades, pillars and columns), of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel. - Other
Articles of iron or steel Structures (excluding prefabricated buildings of heading 94.06) and parts of structures (for example, bridges and bridge-sections, lock-gates, towers, lattice masts, roofs, roofing frame-works, doors and windows and their frames and thresholds for doors, shutters, balustrades, pillars and columns), of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel. - Other
USD 1.87 M | 12.64%
Articles of iron or steel Structures (excluding prefabricated buildings of heading 94.06) and parts of structures (for example, bridges and bridge-sections, lock-gates, towers, lattice masts, roofs, roofing frame-works, doors and windows and their frames and thresholds for doors, shutters, balustrades, pillars and columns), of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel. - Equipment for scaffolding, shuttering, propping or pitpropping
Articles of iron or steel Structures (excluding prefabricated buildings of heading 94.06) and parts of structures (for example, bridges and bridge-sections, lock-gates, towers, lattice masts, roofs, roofing frame-works, doors and windows and their frames and thresholds for doors, shutters, balustrades, pillars and columns), of iron or steel; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures, of iron or steel. - Equipment for scaffolding, shuttering, propping or pitpropping
USD 401.6 K | 2.44%
Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof Other lifting, handling, loading or unloading machinery (for example, lifts, escalators, conveyors, teleferics). - Lifts and skip hoists
Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof Other lifting, handling, loading or unloading machinery (for example, lifts, escalators, conveyors, teleferics). - Lifts and skip hoists
USD 1.2 M | 1.11%
Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof Central heating boilers other than those of heading 84.02. - Boilers
Nuclear reactors, boilers, machinery and mechanical appliances; parts thereof Central heating boilers other than those of heading 84.02. - Boilers
Intel
Identify in-market buyers, prioritize high-potential accounts, and accelerate pipeline growth.
Similar Companies to ooo new time building
Companies importing similar products as of "ooo new time building" in uzbekistan
Companies importing similar HS Codes as of "ooo new time building" in uzbekistan
Other Buyers and Suppliers in uzbekistan who deal in similar products like ooo new time building
Other buyers who import similar products like "ooo new time building"
Explore Transformation Stories
How a US Freight Forwarder Generated
4x More Leads at $1 Cost Per Lead
Trademo’s global trade intelligence platform has allowed us to find leads easily, boosting the team’s productivity and making the process simpler.
Iliana Rodriguez
Operations Team Leader
Frequently Asked Questions
What products does Ooo New Time Building import the most?
Based on recent shipment records, Ooo New Time Building mainly imports zinc. This data is aggregated from verified global customs and trade databases.
Who are the top manufacturers of Ooo New Time Building?
Some of the top manufacturers working with Ooo New Time Building include Gucsan Makina Dogalgaz Madencilik Gida Sanayi Ve Ticaret Ltd Sti, Llc Profmetall And Ooo Peri.
How many shipments has Ooo New Time Building in last 12 months?
In last 12 months, Ooo New Time Building has been linked to 451 verified shipments tracked through international trade data.
What is the total value of imports made by Ooo New Time Building in last 12 months?
The total recorded import value of Ooo New Time Building is estimated at $9.96 M till date, based on aggregated global shipment sources.
How can I analyze Ooo New Time Building global trade network?
With Trademo, you can explore Ooo New Time Building complete trade ecosystem including buyers, manufacturers, shipment volumes, and trade routes, helping you identify opportunities and risks.
APIs
Data License
Plans
Directories
Company
Location
United States
3000 El Camino Real, Building 4, Suite 200, Palo Alto, California 94306
India
2nd Floor, Plot No. 136, Sector 44, Gurugram, Haryana 122003
